Our Biomass Trading Division “SPV Energy” has been installing Biomass systems since 2011 and has rapidly developed into one of the leading MCS registered suppliers and installers of Biomass heating systems throughout Scotland. We specialise in the design, supply, installation and operation of Biomass heating systems for commercial and industrial applications.

From Inception into this market place in 2011, SPV Energy have grown year on year and our Biomass division is now capable of the design and installation of medium to large scale projects, in the last 30 months we have fitted 26 systems ranging from 250kW to 2MW Herz Biomass installs. We have also in 2017, completed a 2MW wood chip drying plant installation for Central Woodchip Co Ltd in Irvine, and a 2MW woodchip Drying Plant for Highland Woodchip Co Ltd in Grantown on Spey in the Scottish Highlands.

Having Both these fuel supply companies BSL Registered to provide top quality Biomass wood fuel, this has allowed the Installation business to provide an added service to our own Biomass customers, with the supply of top quality wood chip for our install customers when we sell and install their Biomass wood Chip Boilers.

The Herz Partnership 

We were invited to join the Herz Partner Network in 2015 due to the quality of our installations and have become a Top Partner in Scotland with Herz Biomass. This gives us access to a wide range of back up and support services, from design to commissioning right through to service and maintenance. This allows us to deliver renewable energy projects to organisations in both the public and private sector spanning multiple industries such as agricultural, hotel, horticultural, tourism, leisure and large manufacturing to name but a few.

We have secured contracts with 5 Leisure centres from Local Councils ranging from 500kW to 1 MW, these are currently at the planning stage. This is in addition to the existing installations now totalling 18MW from all customers.

As industry leaders we have the capability and specialist expertise to fully complete projects from start to finish in-house, to ensure that the project proceeds smoothly as well as cost effectively for customers.
We are unique in providing this complete turnkey project management service. From the initial site visit and through the consultation period, the project is then passed onto our M&E Consultants and team of highly qualified biomass heating engineers who will follow the design plan and deliver the installation on time and within budget.

We are fully MCS certified, GAS Safe registered and NICEIC approved installers to allow our customers to make the most of the government backed Renewable Heat Incentive, (RHI). All our engineers have GAS Safe, HETAS H005 BR Biomass, Bpec, NICEIC Certification, SVQ Mechanical Engineering, Heat Pumps, Solar Thermal and Bpec ESI for Safe Isolation of Electrical Equipment.

Through our dedicated and focused team we are continually researching and developing to ensure we maintain our business at the forefront of a vibrant and exciting renewable industry.